Snip. Snip.
Aug. 11th, 2007 11:20 pmDoublets cut out in the past two days: 4. (Cut out one last weekend.)
Number of pieces per doublet: 26. (15 fabric, 8 underlining, 2 lining, 1 interfacing, if my tired brain has done the counting right)
Total pieces cut: 104. 130 if you count last weekend.
Pattern pieces with scotch tape helping hold them together: at least 5.
Tomorrow, the sewing starts.
Number of pieces per doublet: 26. (15 fabric, 8 underlining, 2 lining, 1 interfacing, if my tired brain has done the counting right)
Total pieces cut: 104. 130 if you count last weekend.
Pattern pieces with scotch tape helping hold them together: at least 5.
Tomorrow, the sewing starts.